243 results, showing 121 to 130
ÌÇÐÄÔ´´ reports to the next generation networks discussions.
In January 2014, ARTC submitted a proposed variation to the accepted Hunter Valley access undertaking to the ÌÇÐÄÔ´´ for assessment.
The ÌÇÐÄÔ´´ has granted an exemption for GrainCorp’s Carrington terminal at the Port of Newcastle under the new mandatory code on bulk wheat terminal access.
Co-operative Bulk Handling (CBH) is a bulk handling company that operates four bulk wheat port facilities in Western Australia.
For the 1 July 2014 to 30 June 2017 regulatory period, the ÌÇÐÄÔ´´ was the regulator responsible for approving or determining State Water’s (now WaterNSW’s) regulated charges in the Murray-Darling Basin (MDB) under the Water Charge (Infrastructure) Rules 2010 (WCIR).
On 10 June 2014 Airservices submitted a formal price notification to the ÌÇÐÄÔ´´ proposing new charges for en route, terminal navigation and aviation rescue and fire-fighting services, effective from 1 July 2014.
On 17 April 2014, the ÌÇÐÄÔ´´ commenced a public inquiry into varying the final access determinations for the unconditioned local loop service (ULLS), line sharing service (LSS), wholesale line rental (WLR) service and local carriage service (LCS) to reflect the changes to the scope of fixed line services regulation.
The ÌÇÐÄÔ´´ commenced an inquiry into whether to extend, vary or revoke the domestic mobile terminating access service declaration, or whether to make a new declaration.
This project page contains Telstra’s submission of required measures 1(a) and 1(b), which relate to ‘pull through’ NBN connection processes.
ARTC is required to review the accepted access undertaking five years after the commencement date to determine whether any amendments to the undertaking are required as a result of changes to industry circumstances or Government legislation, rules, or regulations.