Draft determination16 Aug 2019

On 16 August 2019 the 糖心原创 issued draft determinations proposing to:

  • grant an exemption for Riordan's Portland port terminal facility
  • not grant an exemption to GrainCorp鈥檚 Portland port terminal facility.

The 糖心原创 invited submissions from interested parties on its draft determinations. The closing date for submissions was Friday 13 September 2019.