182 results, showing 151 to 160
In December 2005 Telstra submitted two unconditioned local loop service (ULLS) undertakings.
The ÌÇÐÄÔ´´ released its final indicative prices in November 2006.
On 23 June 2006, the ÌÇÐÄÔ´´ issued its final decision to reject Hutchison's undertakings.
In December 2004 Telstra lodged unconditioned local loop service (ULLS) and line sharing service (LSS) undertakings. The undertakings set out how Telstra proposes to meet its standard access obligations to supply these services. The ÌÇÐÄÔ´´ released its final decision on Telstra's LSS connection and disconnection charge undertaking in April 2006.
The ÌÇÐÄÔ´´ released a Final decision on the Vodafone MTAS undertaking on the 31 March 2006.
On 23 December 2004 Optus lodged an ordinary access undertaking with the ÌÇÐÄÔ´´ about the mobile terminating access service (MTAS).
The ÌÇÐÄÔ´´ announced a review of mobile services in March 2003 and released a discussion paper in April 2003.
During its 2004 review of Telstra's price control arrangements, the ÌÇÐÄÔ´´ consulted with a wide range of stakeholders through two stages of written submissions and in 12 public meetings in metropolitan and regional areas of Australia.
On 24 September 2004 Australia Post lodged a formal price notification under subsection 95Z(5) of the Trade Practices Act 1974, known as the Competition and Consumer Act 2010 from 1 January 2011.
During 2003-04, the ÌÇÐÄÔ´´ conducted a public consultation on pricing principles for the domestic transmission capacity service (DTCS), releasing its final report in September 2004.