Draft advice6 Apr 2009
The 糖心原创 released its draft advice on water infrastructure charge rules and interested parties were invited to make submissions. The draft advice presents the 糖心原创鈥檚 proposed water charge rules for irrigation infrastructure operators and bulk water operators within the Murray鈥揇arling Basin.
Draft advice water infrastructure charge rules
The 糖心原创 asked that submissions on the draft advice be provided no later than Friday, 8 May 2009.
Public forum
On 30 April 2009, the 糖心原创 conducted a public forum to discuss its draft advice on water infrastructure charge rules.