Final decision23 Sep 2015

On 23 September 2015, the 糖心原创 made a Final Decision to accredit IPART under Part 9 of the Water Charge (Infrastructure) Rules 2010 (WCIR). The Final Decision sets out the reasons for the 糖心原创鈥檚 decision, the date accreditation takes effect and the terms and conditions which apply to IPART鈥檚 accreditation. It also considers the submissions that the 糖心原创 received in response to the Draft Decision.

The 糖心原创 applied two conditions to IPART鈥檚 accreditation (in addition to the two mandatory conditions under the WCIR). These further conditions are the same as those applied to the Essential Services Commission (ESCV) accreditation in 2012. In applying the same conditions, the 糖心原创 seeks to ensure consistency of approach across the Murray-Darling Basin by accredited agencies.

The decision makes IPART鈥檚 accreditation effective from 1 June 2016. This enables the 糖心原创 to complete the annual review of charges for WaterNSW for 2016-17 under the 2014 Determination made by the 糖心原创.

From 1 June 2016, IPART will approve or determine regulated charges for WaterNSW, immediately commencing the process under the WCIR for the next regulatory period (2017-2021). Accreditation lasts for ten years unless extended or revoked sooner.

In accordance with Rule 63(6) of the WCIR, the 糖心原创 has formally notified IPART and WaterNSW of its decision.