317 results, showing 61 to 70
The ÌÇÐÄÔ´´ is reviewing the regulatory framework for ARTC's Interstate network.
On 3 September 2021, Port of Portland Pty Limited applied to the ÌÇÐÄÔ´´ to be determined an exempt service provider of port terminal services at its port terminal facility at Portland, Victoria.
On 3 May 2022 the ÌÇÐÄÔ´´ released a final determination document confirming that it has determined Port of Portland Pty Limited to be an exempt service provider of port terminal services at its Portland facility. The exemption was made by notifiable instrument.
The ÌÇÐÄÔ´´ is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from the operation of the requirements of Part 6 of the WCR.
The ÌÇÐÄÔ´´ is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from the operation of the requirements of Part 6 of the WCR.
The ÌÇÐÄÔ´´ has the ability to collect information from industry through the record keeping rule to undertake its telecommunications regulatory functions.
The ÌÇÐÄÔ´´ is required to report annually to the Minister for Communications on changes in the prices paid for telecommunications services in Australia. This report is a legislative requirement under s 151CM(1)(a) in Division 12 of Part XIB of the Competition and Consumer Act 2010 (the Act).
The ÌÇÐÄÔ´´ is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from operation of the requirements of Part 6 of the WCR.
The ÌÇÐÄÔ´´ administers the access regime for the digital radio access service under section 118 of the Radiocommunications Act 1992 (Radiocommunications Act).
The ÌÇÐÄÔ´´ is required under Part 6 of the Water Charge Rules 2010 (WCR) to decide whether on-river infrastructure operators meet the definition of ‘Part 6 operators’ and, if so, whether to grant them an exemption from operation of the requirements of Part 6 of the WCR.
On 20 December 2021 the ÌÇÐÄÔ´´ wrote to Port of Portland Limited (POPL) regarding its 2021-22 bulk grain export capacity allocation process and non-compliance with subclause 25(2) of the Port Terminal Access (Bulk Wheat) Code of Conduct.